3R Valve is providing a 4 inch AR (artifical recharge) valve for Portland State Unversity for the reinjection of HVAC water back into the aquifer from which it came from.

 Setpoint 1 screen

 Setpoint 2 screen

 Attachment0.jpg  Attachment1.jpg

 Control panel

 4 inch AR valve

Attachment2.jpg

Attachment4.jpg

 

 Valve and Hose

 Putting the valve on the first pipe.

 IMG_0062.jpg

 IMG_0064.jpg

 Pipe coming throught the vault wall

 Hydraulic pump mounted on the vault wall

 IMG_0070.jpg

 IMG_0071.jpg

 Well head throught the man hole

 Putting the well head on the last pipe

 IMG_0069.jpg

 IMG_0067.jpg