For more information copy and paste this link.

http://www.chbcnews.ca/video/campus+goes+geothermal/video.html?v=2168528400#top+stories

 

 

IMG_4283.jpg  IMG_4295.jpg

 UBC Campus at Kelowna BC

 Installing the 3RValve on well 7

 IMG_4311.jpg  IMG_4317.jpg

 Valve installed on well 7

 Lowering it down the well

 IMG_4340.jpg  IMG_4378.jpg

 Attaching the Hydraulic hose

 Controlers installed

 IMG_4391.jpg  IMG_4397.jpg

 Pulling the column on well 6

 Installing the valve on well 6

 IMG_4410.jpg  IMG_4424.jpg